top of page
Search
  • uniovi

Final assembly complete. Testing begins

We have finally completed the assembly of the tri-lateral head and elevator. When the time came to unite the elevator and tri-lateral head we were all quietly confident but when the two sections fit together without problems it was high fives all round.

Although the parts have been tested somewhat independently, we will now begin testing of the system as a whole. In our next post we will upload pictures and videos of the system in action.


37 views0 comments

Recent Posts

See All
Post: Blog2_Post
bottom of page